  • The Cutler School was accepted into the program in 2022 after submitting 4 Statements of Interest previously.
  • It was one of just 17 projects selected in that round.
  • The School Building Committee then studied 24 sites within Hamilton and Wenham, resulting in the evaluation of 14 design options
  • The Preferred Schematic Report included new construction, renovation, addition, and consolidation choices of not only Cutler School, but Buker and Winthrop Schools as well. 
  • Using  detailed evaluation criteria  from this process, the school building committee selected a single design option.