Documents & Reports
CUTLER ELEMENTARY SCHOOL MSBA STATEMENT OF INTEREST - 2021
WINTHROP ELEMENTARY SCHOOL MSBA STATEMENT OF INTEREST - 2021
BUKER ELEMENTARY SCHOOL MSBA STATEMENT OF INTEREST - 2021
2022 State of our School Facilities Report
5/5/22 Initial Compliance Certification
7/14/22 School Building Committee
11/1/22 MSBA Enrollment Letter
11/1/23 Educational Visioning Report
11/3/22 Study Enrollment Certification
11/9/23 HWRSD Educational Plan - Elementary School Project
11/13/23 Analysis of Alternative Sites
11/27/23 Design Options Presented for PDP Estimating
12/12/23 Letter to Town of Hamilton Select Board RE: Cutler & Winthrop Lease Agreements/Renewals
12/18/23 PDP Options Cost Estimates (revised 12/20/23)
1/10/24 Community Forum/Q&A Presentation Recording & Q&A Presentation
1/11/24 Design Options for PDP Estimating
1/25/24 Cutler Evaluation of Existing Conditions
1/25/24 Preliminary Design Program Submitted to the MSBA
2/26/24 SBC Qualitative Evaluation Summary - PDP Options
3/6/24 HW Elementary School Sustainability Workshop / Workshop Minutes
4/18/24 PSR Comparative Cost Estimates
4/22/24 SBC Voted Preferred Design Option
6/6/24 Module 3 Grade Reconfiguration and Districting Approval Certification
6/27/24 Preferred Schematic Report Submitted to the MSBA
9/3/24 "Underground Stream" Response
9/9/24 SD Phase Geotechnical Report
9/9/24 Phase II Limited Subsurface Investigation Report
9/10/24 Hazardous Building Materials Survey Cutler
1/3/2025 HWRSD DESE Special Ed Letter
1/23/25 DESE Special Education Space Approval Letter
1/17/2025 Schematic Design Submission
2/26/25 Cutler Elementary School Project Scope and Budget Authorization Board Action Letter